Engineered welded steel frame
Full machine hot dipped galvanized/powder coated
7.6 cubic foot certified blast pot
100 gallon on-board water tank
Air requirement: 375Cfm-1500Cfm
Blast pressures achievable: 25PSI-120PSI
Surface Profile Achievable: 0-4Mill
Pneumatically operated (with optional 12 volt)
Offshore-ready skids = no basket required and OSHA compliant. The frames include 4 Padeyes at each top corner with full integrity. They pass Magnetic Particle and visual inspection every year, and every 5 years receives a Load test of 8,750 lbs. The slings are ½”x5’ 6x19 galvanized 4 legs on 1” Crosby ml w/hdts all ends and 5/8” Crosby bta shackles on the bottom of each leg. As well, they pass Proof Test (per leg) of 10,000 lbs. and visual inspection yearly. **Wire rope slings are inspected and tested in accordance with ASME B30.9, API 9A, 9B & 2D and, if applicable, OSHA regulations.**